Asbestos Inspection and Removal
Overview
framework expiry date: 31/01/2014
The framework covers:
Lot 1 – Inspections
- MHDS 100 compliant surveys – Type 2 and Type 3
- Bulk sampling and analysis
- Site visits
- 24/7 call-outs
- Air monitoring and site supervision
- Specification design and risk assessments
- Asbestos treatment and removal management if required
- General and project specific asbestos advice
- Re-inspections (over the four year period) to enable clients to update asbestos management databases
Lot 2 – Removals
- Remedial works (where possible removal of asbestos will be avoided)
- Careful and controlled removal of asbestos containing materials (ACM's) in accordance with current legislation
- Full decontamination or encapsulation and /or treatment of rooms / areas containing ACM's
- Controlled pick up and disposal of asbestos or equipment that may contain asbestos
- Carry out site visits
- 24/7 and 365 emergency call-outs
- Temporary reinstatement facility to make safe and secure asbestos rooms/ areas